Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Oil prices swing after Brent tops $90 on supply strains

    August 3, 2026

    DR Congo Ebola outbreak reaches record scale

    August 3, 2026

    Trump cancels Iran strikes pending rapid nuclear deal

    August 3, 2026
    Facebook X (Twitter) Instagram
    • Home
    • Contact Us
    Kenya ExaminerKenya Examiner
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Kenya ExaminerKenya Examiner
    Home » With a $30 billion power grid upgrade, India to triple clean-power capacity by 2030

    With a $30 billion power grid upgrade, India to triple clean-power capacity by 2030

    December 9, 2022
    Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email

    In order to achieve its goal of nearly tripling the country’s clean-power capacity by 2030, the Indian government, under Prime Minister Narendra Modi, has unveiled a Rs 2.44 lakh crore ($29.6 billion) plan to build transmission lines for renewable generation in the country. According to a statement from the Ministry of Power, through the project, solar plants in the sun-drenched deserts of Rajasthan and Gujarat, as well as wind farms in Tamil Nadu, will be connected to the national power grid.

    By the end of the decade, India’s inter-regional transmission capacity will increase from 112 gigawatts to 150 gigawatts. The lack of transmission lines in India has hampered the growth of renewable electricity in the country. It is essential for the nation to address this shortfall as it embarks on its journey towards net zero by 2070. This is so that clean energy can be carried to urban and industrial hubs that are often remote from sources of energy.

    With a total generation capacity of 173 gigawatts, India generates its electricity from non-fossil fuel sources, which includes building transformers and high-voltage lines to transport power over long distances, as well as laying submarine cables for transferring electricity from offshore wind projects. Despite the fact that the power networks sector welcomed the revised plan, it did sound a note of caution with regards to the awarding of contracts. The private transmission companies have been lobbying New Delhi to allocate all projects through competitive bids rather than allowing the state-run Power Grid Corp. of India Ltd. to get some of the projects without any competition.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Oil prices swing after Brent tops $90 on supply strains

    August 3, 2026

    UK solar capacity reaches 22.8 GW before plug-in launch

    August 3, 2026

    India commits 84084 crore rupees to offshore energy security

    August 1, 2026
    Latest News

    Oil prices swing after Brent tops $90 on supply strains

    Business August 3, 2026

    NEW YORK / RankWire.AI / – Oil prices surged on July 29, pushing Brent crude…

    DR Congo Ebola outbreak reaches record scale

    August 3, 2026

    Trump cancels Iran strikes pending rapid nuclear deal

    August 3, 2026

    Austria sets July heat record amid €1.4 billion losses

    August 3, 2026

    UK solar capacity reaches 22.8 GW before plug-in launch

    August 3, 2026

    Australia reforms National Disability Insurance Scheme rules

    August 1, 2026
    © 2026 Kenya Examiner | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.